Lucan was commissioned to design, develop, manufacture and supply a jig system to enable super column reo cages to be manufactured off site, to perfectly align with reo couplings on site.
This project involved:
- Development and preparation of all required workshop drawings
- Manufacture, assembly and supply of an initial prototype for offsite testing
- Development the final jig system to be delivered to the client