Lucan Engineering was engaged by Veolia Environmental Services to build a new control room before decommissioning their old admin block. Lucan demolished and rebuilt the old admin block complete with bathrooms, a lunch area and classrooms.
The project involved/features:
- Design and construction of a new training room
- Refurbishment of Male and Female toilets and the change rooms
- Structural Steel Mezzanine Frame and access staircase
- Construction of another training room on top of the installed 2nd level Mezzanine
Location
20 Barrow Road, Spring Farm, NSW Australia 2570
Client
Veolia Environmental Services
Completion
04/25 - Ongoing