Veolia Spring Farm Office Building Fit Out

Lucan Engineering was engaged by Veolia Environmental Services to build a new control room before decommissioning their old admin block. Lucan demolished and rebuilt the old admin block complete with bathrooms, a lunch area and classrooms.

 

The project involved/features:

  • Design and construction of a new training room
  • Refurbishment of Male and Female toilets and the change rooms
  • Structural Steel Mezzanine Frame and access staircase
  • Construction of another training room on top of the installed 2nd level Mezzanine

Location

20 Barrow Road, Spring Farm, NSW Australia 2570

Client 
 

Veolia Environmental Services 
 

Completion

04/25 - Ongoing


 