Veolia Spring Farm Solar Panel Removal
Lucan Engineering was engaged to isolate, disconnect and remove all of the fire damaged solar panels off the Transfer Station Roof and to install a temporary trimdeck roof over the damaged skylight areas.
This project involved:
- Installation of a temporary Static Line connected to a trimdeck anchor
- Electrical isolation and disconnection of all solar panels
- Removal of existing solar panels
- Installation of steel roof sheets over sky light areas
Location
20 Barrow Rd, Spring Farm, NSW 2570
Client
Veolia Environmental Services
Completion
05/2026